• Home
  • Live Projects
  • Summer Projects
  • Projects Archive
  • Get Connected
  • Hands-on-Reflections
  • Hands-on-Blog
  • New Hands
  • About The People
  • About The Research
  • About The Theory
  • About The Method
  • Impact and References
  • Reference/Information
  • resources
  • News
Menu

HANDS ON BRISTOL

Street Address
bs1
Phone Number
LEARNING TO COLLABORATE, COLLABORATING TO LEARN

Your Custom Text Here

HANDS ON BRISTOL

  • Home
  • Live Projects
    • Bristol 650
    • Carlos Trower pt 2
    • Disability Activism Bristol
    • DAIGO 9
    • Coleford: Our Story
    • Kingsdown Reconnecting
    • A Year of Grounding
    • Stoke Park
    • Riverside Park
    • Al Baseera Mosque
    • Memorial Garden: Redcliffe
    • Redcliffe
    • The Grand Iftar canopy
    • Buskers Festival
    • A Just Transition
    • Newtown Lighting pt 2
    • Newtown lighting pt1
    • Hotwells Mini Masterplan
    • St Werburghs Community Centre
    • Hawkwood: Centre for Future Thinking
    • Coleford: Mushet Walk & Active Travel
    • Barton Heat
    • BS3 Commercial
    • Carlos Tower pt 1
    • Coleford Linkages
    • Community Led Parks
    • Craft Quarter
    • Frome Gateway
    • Hillfields
    • Marsh Maker
    • Newtown
    • PRSC
    • Puppet Place
    • St Pauls Museum
    • LITTLEMEAD Primary Academy
    • HIGH DENSITY BRISTOL
    • SHAPE OUR CITY
    • BRISLINGTON GREEN TRAIL
    • OLD MAGISTRATE’S COURT - Creative
    • Maskelyne Park, Manor Farm
    • Bath Pavilion
    • Elm Tree Farm 2017
    • Maindee Library Mobile Cafe
    • UWE Engineering Block
    • House of Mirrors
    • OLD MAGISTRATE’S COURT - performance
    • FROME
    • COLEFORD
    • ST GEORGES
  • Summer Projects
    • Workshop Holzbau, Trondheim
    • RAW!
    • Shape My City #livebuild
    • Festival of Nature
    • Liven & Lighten-up Leonard Lane
    • GROWING TOGETHER
    • Rimondato 2018: Playground Refurbishment
    • Venice Biennale 2018
    • Rimondato 2017: School Refurbishment
    • Make Lewes 2016
    • Make Lewes 2015
    • Building Man 2014
    • Make Lewes 2014
  • Projects Archive
    • Ebenezer Gate Pocket Park
    • Elm Tree Farm
    • Elm Tree Farm Village Hall
    • Under the Flyover
    • Wayfarers
    • Junction 3
    • Woodlands Academy
    • Totterdown Steps
    • Inclusive Enterprise Zone
    • Co-housing: 325 Fishponds Road
    • Up Our Street
    • Babbasa
    • Southmead Pocket Park
    • East Street Pocket Park
    • Parcel Force
    • Easton and Lawrence Hill
    • Sort
    • Play in the Bearpit
    • Sponsors' Structure
    • Love the Future
    • [Re]Claiming Totterdown
    • Make Life More Absurd
    • Nooks and Crannies
    • Redcliffe Wharf Outdoor Swimming
    • NP20 Pillgwenlly
    • UWE 2015 End of Year Exhibition
    • Red Brick Building, Glastonbury
    • Henleaze Swimming Lake
    • "Air Your Laundry"
    • Recycling Creativity
    • Junction 2 Roundabout
    • Narrow Quay Markets: STAGE 2
    • Narrow Quay Markets: STAGE 1
    • Growing Tall
    • Lawrence Hill Roundabout
    • Beckery Old Road - Self-Finish Housing
    • Revitalising the High Street
    • Depersonalised Space
  • Participate!
    • Get Connected
    • Hands-on-Reflections
    • Hands-on-Blog
    • New Hands
  • Research
    • About The People
    • About The Research
    • About The Theory
    • About The Method
    • Impact and References
    • Reference/Information
  • resources
  • News
    • News
DSC_0460.JPG

Workshop Holzbau, Trondheim

Reflective Blog

August 20, 2014 Lee2.Bartholomew@live.uwe.ac.uk

I became too caught up in the process to write anything whilst on the workshop, so this is more a reflective overview (also meant I lost track of the days)

Day 2-4: Consensus design

Having arived one day late - and after a long overnight train journey - we jumped straight in with the design process, using several approaches (sketching, modelling, roleplay, contextual city tour, etc.). I found our norwegian counterparts spoke excellent english and had no problems discussing design ideas with them - having a common architectural language, which included a lot of drawing. 18 people on a design team makes an interesting process, everyone had contributions to make, leading to some very long conversations. We tried to explore every aspect of the ideas that emerged, and finally after a kind of 'creative struggle' landed on a strong concept that everyone agreed on.

Day 5-?: Construction design

The materials have already been ordered, the foundations already in very specific points in the ground and we've just come up with a design concept. Now to put them together, easy right? Maybe not. We had to come up with a unique way of using the materials to realise our ideas. Modelled different contruction systems, at 1:1 and smaller scales. (More) long discussions, with seemingly conflicting ideas - but again, at the end of the process we all came to the same conclusions. Considered a lot of apects of the materials - wear, stiffness, strength, weathering

Day ?-?: Building, detail design

With the basic contruction system decided the building could begin, with parallel teams working on the details and the final form. I was working with Eirick calculating the rise and going of the steps, the connection details between the frames and the platform sizes, and producing drawings. Which - with the frames already being built at specific sizes, the foundations already existant and each step and platform needing to fit an exact number of wooden boards 28mm wide - became a mathematical challenge. Often found myself running out to the construction team shouting something like 'frame 1 needs to be 21mm closer to frame 2 than it is now!'

Learned a lot about tolerance and how exact we should be. In the end we had a tolerance of 4mm for each step - which turned out to be too much, but if we were to be exact to the millimetre it would have became much harder to build, with no allowance for movement of the wood.

Final few days: Finishing, adapting

The steps were mostly in, the overall shape was coming together. We could see the light at the end of the tunnel - in the form of LED's illuminating our structure from underneath. A voice spoke to us out of nowhere, and it said 'Arrghh!' - it was Kristian in his heroic effort to fit said lighting by crawling under what we had already built.

Also having to adapt the design to the building process, had to remove a foundation where we intended to have a bench because of lack of materials, but this actually strengthened the design. Adaptation is something that has happened all through the process - for example, when we found we had to have a railing down the length of the staircase, we changed the design so this could run down on one side - which also made it more organised and coherant. Our limitations forced us to find creative solutions, which became improvements.

Last day

High spirits today, everyone really happy with the way its turning out. Still lots to do but the end is firmly in sight.

Lee Bartholomew

← What I Learned in Trondheim, by Sophie Penultimate Day →

If you have a project that you might think we can help with; or just want to find out more; please email us!

email: sally.daniels@uwe.ac.uk
email: ann.degraft-johnson@uwe.ac.uk

Research
Get Connected

Powered by Squarespace